case studies

Four projects. Zero overruns.

The methodology behind KiVerify™ was first used on four Northern
California public sector built environment projects. None of the four had a cost overrun.

$29.9M
Total Value Managed
$4.75M
Total Verified Savings
15.9%
Average Savings Rate
5.9×
Realized vs. Projected Profit¹
38–75%
Schedule Compression²
Zero
Cost Overruns Across All Projects
40–66%
Carbon Reduction³
4
Projects · 4 Project Types · 1 Consistent Result
Footer disclosure: Historical results. Four public sector built environment projects completed by the Covenantz founders. The record is the empirical origin of the methodology, not evidence of the current independence architecture. Past results are not indicative of future outcomes. ¹ Realized profit of $2.3M vs. $389K projected on the $20M County Government Agency project. ² Schedule compression applies to three of four projects. The School District Renovation was delivered on schedule within its contracted window. ³ Measured on two of four projects using LEED-aligned methodology. Not recorded on remaining two projects.